Vancouver Canada

409 Granville St

Salt Lake City USA

10717 South State Street

info@tercerolithium.com

Office Hours 9am - 5pm

Projects

Home – Projects

Our Projects

Tercero Flagship Project

Tercero Lithium is a mining exploration company with a goal to become a leading lithium carbonate supplier for the burgeoning lithium battery industry by focusing on resource exploration and deploying a low-risk approach to development.

Milestones Achieved & Notable Competitive Advantages

  • Completed 43-101 Technical Report
  • Obtained exclusive water rights for 500 gallons per minute
  • No royalties
  • Tested brine at surface level with excellent assay results (production could commence from surface)
  • Soil sediment enriched with an average of 200 parts per million (“ppm”)
  • Proposed plant is ideally situated in close vicinity to Interstate 80 (“i-80”)
  • Located within 10 miles of a railway
  • A reasonable network of graded and paved roads connects the claim area to I-80
  • Country road runs alongside of the claims
  • Existing three-phase electric power is within 2 miles
  • 5.5 hour drive to Tesla Gigafactory
  • Obtained drill permit and road use permit from state of Utah

Tercero Claims Map

  • Tested brine at surface level with excellent assay results
  • Tercero has secured lithium claims on 11,500 acres (18 sq. miles) in Pilot Valley
  • Acquiring new land claims in key geography
  • 25 miles from Wendover, Utah
  • A network of graded and paved roads connects the claim area to I-80

Surface Level Test Results

  • Tercero hand augured 10 holes to depths of 6 feet across the claim area. Brine was sampled using PVC tube method and tested with ALS Labs.
  • Experts and Tercero believe higher grades will be located at deeper aquifers.

Accessibility & Infrastructure

The infrastructure necessary for powering operations and facilitating transportation is highly developed, providing reliable access to essential utilities such as electricity and water. The region benefits from existing road networks, making transportation of equipment and materials efficient and cost-effective. This well-established infrastructure minimizes logistical challenges and supports seamless operational activities, contributing to the overall viability of the project.

How We Work

Our Working Process

Our process is driven by precision, innovation, and responsibility. Every phase of our operation is designed to maximize resource potential while upholding the highest safety and environmental standards. Here’s how we turn opportunities into results:

0 .
Research & Exploration

We begin with comprehensive geological surveys and cutting-edge exploration technology to identify and assess high-potential sites, ensuring every project starts with a strong foundation.

0 .
Design & Planning

Our experts develop strategic mining plans tailored to each site. We prioritize efficiency, safety, and sustainability, crafting solutions that align with both operational goals and environmental regulations.

0 .
Extraction & Production

Using advanced extraction methods, we optimize resource recovery while minimizing waste. Our commitment to operational excellence ensures consistent, high-quality production at every stage.

0 .
Closure & Rehabilitation

Sustainability is at the heart of our mission. We implement thorough site closure plans that focus on environmental restoration, returning the land to a safe, stable, and productive state for future use.

Join Us in Shaping the Future of Lithium!

Subscribe For Newsletter!